Office Time.
Mon - Sat 10.00 am - 06.30 pm

Our Execution Process

How We Work

Our Execution Process

01
Design & Drawing
  • Electrical Design & Engineering
  • EPLAN / AutoCAD Drawings
  • Cable Schedule & SLD
  • I/O List & Panel Layout
02
Control Panel Manufacturing
  • PLC Panels
  • MCC & PCC Panels
  • VFD Panels
  • Remote I/O Panels
  • Factory Acceptance Testing (FAT)
03
Installation
  • Cable Tray Installation
  • Cable Laying & Termination
  • Panel Installation
  • Motor & Field Wiring
04
Automation
  • PLC Programming
  • HMI Development
  • SCADA Development
  • System Integration
05
Testing & Commissioning
  • I/O Checking
  • Loop Testing
  • Dry & Wet Trials
  • Performance Validation
  • Site Acceptance Testing (SAT)
06
Production Support
  • Troubleshooting
  • System Optimization
  • Preventive Maintenance
  • Retrofit & Automation Upgrades